Q / Engineering
Budget check
Illustrative demo The task
Demonstrate that a zero budget blocks a paid step before it is called. Show the stopped state and the evidence of whether any external call occurred.
The example result
This is an illustrative result, not a recorded run. A deliberate stop with an inspectable record. This template is a budget regression example, not a universal guarantee that every provider’s spending can be measured or capped.
- Estimate work
- Check the ceiling
- Continue within limits
- Stop before overspending
Start with this loop
Test the budget ceiling →3 stepsWorkflow overview
100%
Related loops
- Test the budget ceiling
Verify that a zero budget stops the loop before a paid step.
Components in this workflow
One prompt to your result
Your agent handles setup, configuration and checking the result in your project.